Sod Calculator
Sod is perishable, so order the right amount once. Enter your lawn area to get the square footage (with waste), rolls and pallets you’ll need.
Sod Calculator
Why use the Sod Calculator
Sod is perishable, so you want to order once and get it right. This includes a waste margin and converts to rolls and pallets.
How to get your numbers
- Area to sod — split odd shapes into rectangles and add.
- Prep the soil before delivery.
- Lay it within 24 hours.
Recommended for this job
How to use it
- Enter the area to sod (break odd shapes into rectangles and add them).
- The tool adds 5% for cuts and waste.
- Have the ground prepped before delivery — lay sod within 24 hours.
Frequently asked questions
How much sod do I need?
Your area in square feet plus about 5% for trimming. A standard roll covers roughly 10 sq ft and a pallet about 450 sq ft.
How big is a pallet of sod?
Usually around 450 square feet, though it varies by farm and roll size.
When is the best time to lay sod?
Any time during the growing season with adequate water — early fall and spring are ideal, avoiding peak summer heat.
How soon should I lay sod after delivery?
Within 24 hours. Sod is living grass and heats up and dies quickly while stacked on the pallet.
How do I prepare the ground for sod?
Remove old growth, loosen and grade the soil, level it, and firm it lightly so the sod makes full contact and roots quickly.
Sod or seed — which is better?
Sod gives an instant lawn and resists erosion but costs more; seed is cheaper and offers more variety but takes weeks to establish.
How long before I can walk on or mow new sod?
Keep off it for about two weeks; mow once it is rooted (gently tug — resistance means the roots have taken).




